§ 189-14. Restoration of surface sidewalks.  


Latest version.
  • A. 
    By the Town. Permanent resurfacing of excavations in the sidewalk area shall be made by the Town. If a large amount of square yardage is involved (100 square yards or more) the permittee may repair the sidewalk area under the direct supervision and specifications of the Town.
    B. 
    By the permittee. Upon completion of the backfilling, the permittee shall place one inch of temporary paving material (cold mix) on the top surface of the backfill to protect the pedestrian travel on the sidewalk excavated and shall maintain such temporary patch for 90 days after backfilling is completed.