The maximum length of open trench permissible
at any time shall be 200 feet, and no greater length shall be opened
for pavement removal, excavation, construction, backfilling, patching
or any other operation without the written permission of the Town.
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');